3.2 DMADV (Define, Measure, Analyze, Design, Verify)
DMADV is a methodology under the Six Sigma framework used to design new processes, products, or services to meet customer requirements at a high-quality level. It focuses on creating processes that are inherently efficient and defect-free. Each phase of DMADV is explained below:
1. Define Phase
- Objective: Define the goals and objectives of the project aligned with customer needs and business strategy.
- Key Activities:
- Identify the need for a new product, process, or service.
- Clearly articulate customer requirements (Critical-to-Quality or CTQs).
- Define the scope, deliverables, and success criteria of the project.
- Tools Used:
- Project Charter
- Voice of the Customer (VOC)
- Stakeholder Analysis
2. Measure Phase
- Objective: Quantify customer needs and translate them into measurable performance requirements.
- Key Activities:
- Gather and analyze customer requirements and feedback.
- Define performance metrics and quality standards for the new process or product.
- Identify potential risks and constraints.
- Tools Used:
- Quality Function Deployment (QFD)
- Benchmarking
- Risk Assessment Tools (e.g., FMEA)
3. Analyze Phase
- Objective: Develop potential design concepts and select the best option based on analysis.
- Key Activities:
- Analyze customer and business requirements to determine design features.
- Brainstorm multiple design alternatives.
- Evaluate alternatives using feasibility studies and cost-benefit analysis.
- Tools Used:
- Design of Experiments (DOE)
- Simulation Models
- Trade-off Analysis
4. Design Phase
- Objective: Develop detailed designs for the chosen alternative and prepare for implementation.
- Key Activities:
- Create detailed designs, prototypes, or mock-ups.
- Validate the design through simulations, pilot testing, or customer feedback.
- Ensure designs meet predefined CTQs and performance requirements.
- Tools Used:
- CAD Tools (for product design)
- Prototyping
- Pilot Testing
5. Verify Phase
- Objective: Test and validate the final design to ensure it meets all customer and business requirements.
- Key Activities:
- Conduct rigorous testing and validation of the new process or product.
- Collect customer feedback on the final design.
- Implement the design into production or service delivery.
- Monitor performance during initial rollout to ensure success.
- Tools Used:
- Validation Testing
- Control Charts
- Process Capability Studies
Key Differences Between DMAIC and DMADV
- Purpose:
- DMAIC: Used for improving existing processes.
- DMADV: Focused on designing new processes or products.
- Outcomes:
- DMAIC aims to optimize and stabilize.
- DMADV aims to create processes that meet all quality standards from inception.
- Flexibility:
- DMAIC works with existing infrastructure.
- DMADV builds infrastructure from scratch if needed.
Key Benefits of DMADV
- Customer-Centric: Ensures the final design aligns perfectly with customer needs.
- Proactive Quality Assurance: Avoids defects by building quality into the design process.
- Efficiency: Creates streamlined processes or products that minimize waste from the start.
- Innovation: Encourages creative and effective solutions for unmet needs.
DMADV is particularly useful in situations where existing processes cannot be adapted to meet customer needs or when launching entirely new products or services. It helps organizations deliver superior value and maintain a competitive edge.